CallowayCoastal
Aldern Point House at dusk, seen from the water

Marin Calloway · The Sablecoast

Three plots.
One coast.
Nothing finished yet.

I represent architect-designed houses on the Sablecoast before they are built — which is the only point at which you can still change them.

See what is released (503) 555-0142

A finished house tells you what someone else decided.

An unfinished one is still a conversation. My work is to get you into that conversation early enough to matter, and to be straight with you about what is genuinely still open and what is already cast in concrete.

Aldern Point House · Section A–A

The house is eleven metres tall and the cliff does most of the work.

Scroll to take the cut down through it, floor by floor.

TIDE DECK LIVING FLOOR SLEEPING FLOOR UP UP A B C D E F FFL +2.400 FFL +5.800 FFL +9.200 ROOF +12.600 MHWS ±0.000 3400 3400 3400 21 JUN · 69° 21 DEC · 22° N
Section A–A 1:100 · Vail Sonderby Architects

Level 0FFL +2.400

Tide Deck

A boathouse, a cedar sauna, and a concrete deck the spring tides reach. The slab is cast one metre above mean high water springs and tied back into the basalt with sixteen rock anchors.

890 sq ft

Tide Deck of Aldern Point House, interior rendering

Level 1FFL +5.800

Living Floor

Kitchen, dining and hearth in one room, behind a glazed wall ten and a half metres long facing due west. The slab above oversails by 850mm, which is what keeps the June sun off the glass at midday.

1,640 sq ft

Living Floor of Aldern Point House, interior rendering

Level 2FFL +9.200

Sleeping Floor

Four rooms set back into the headland, each with its own sea window. The rear wall is the retaining wall: 300mm of board-formed concrete holding the hillside off the house.

1,650 sq ft

Sleeping Floor of Aldern Point House, interior rendering

Currently released

Three houses, at three different stages.

Released

Aldern Point House

Three floor plates stepping down eleven metres of basalt to the tideline.

Beds
4
Baths
3.5
Interior
4,180 sq ft
Completion
Spring 2027

$4,750,000

See the drawings

Two of three released

Kittiwake

A single low room, 34 metres long, glazed on both sides of an exposed bluff.

Beds
3
Baths
2.5
Interior
2,940 sq ft
Completion
Autumn 2026

$3,280,000

See the drawings

Reserved off-market

The Longhouse

Charred timber and concrete, set among coastal pine on the sheltered side.

Beds
3
Baths
2
Interior
2,410 sq ft
Completion
Winter 2027

$2,690,000

See the drawings

How it goes

From walking the plot to holding the keys, this is the whole sequence.

  1. 01OrientationHalf a day
  2. 02ArchitectTwo to six weeks
  3. 03Design developmentThree to five months
  4. 04Coastal reviewFour to nine months
  5. 05GroundworksTwo to four months
  6. 06Frame and envelopeSix to ten months
  7. 07HandoverOne week

Read the long version

Board-formed concrete, white oak, patinated brass and basalt slate samples

The palette

Four materials, used everywhere, chosen because they age well in salt air.

Board-formed concrete

Cast against rough-sawn planks so the grain stays in the face. It weathers, and it is meant to.

White oak

Rift-sawn, unstained, finished with hardwax oil. Wide boards, because narrow ones read as flooring rather than as floor.

Patinated brass

Left unlacquered on handles and edges, so it darkens where hands go and stays bright where they do not.

Basalt slate

Quarried eleven miles inland. The same stone the cliffs are made of, which is the only reason to use it.

Before you ask

The four questions every buyer asks me first.

Can I still change the design?

It depends which stage the plot has reached. Before coastal review is submitted, most internal walls are still movable and material choices are entirely open. After submission, changes to the envelope mean resubmitting, which typically adds four to six months. I will always tell you which side of that line a plot sits on before you offer.

What does completion date actually mean?

It means the date the contractor is currently working to, not a date anyone can guarantee. On this coast the two reliable causes of delay are coastal review and winter groundworks. I quote the contractor's programme and tell you separately what I think is realistic.

Are the renderings what gets built?

The renderings show the design as drawn, which is why the drawings are published alongside them. Where a material is still open, it says so on the release page. If something shown has not been specified yet, I would rather you know that before viewing than after.

Do I need my own architect or surveyor?

You do not need your own architect, since the plot comes with one. You should have your own structural surveyor review the groundworks package, particularly on the cliff plots. I can suggest three; I do not take a referral fee from any of them.

All questions

Come and stand on one of them.

Tours run at the hour the light actually matters, which on this coast means early or late. Tell me which plot and I will tell you when to come.

Book a private tour (503) 555-0142

Call Marin Calloway(503) 555-0142